Pantex Advanced Fabrication Facility
- Amarillo, TX
- Design-Build 18,000 SF Pre-Engineered Metal Building for an Advanced Fabrication Facility (AFF) at the Pantex plant on a brownfield site
- Clear-span high-bay manufacturing space; special foundations to accommodate equipment; additive manufacturing, water jet, post processing, and inspection rooms; a tool crib; storage room; office space to accommodate 25 people; and various support spaces.
- 20,000-pound forklift loading capabilities, two 10-foot forklift aisles along the sides of the manufacturing space