Re-Skin and Enclose for Full Building Restoration
![Re-Skin and Enclose for Full Building Restoration-3 Re-Skin and Enclose for Full Building Restoration](https://www.kconinc.com/wp-content/uploads/2023/07/Re-Skin-and-Enclose-for-Full-Building-Restoration-3.jpg)
PROJECT HIGHLIGHTS:
- Installation of new metal wall panels and girts
- Supply and install two (2) overhead doors
- Supply and install two (2) man doors
- Preparation and painting of existing steel
- Design and installation of additional steel and supports
- Installation of concrete curb with water stop
![Re-Skin and Enclose for Full Building Restoration-2 Re-Skin and Enclose for Full Building Restoration](https://www.kconinc.com/wp-content/uploads/2023/07/Re-Skin-and-Enclose-for-Full-Building-Restoration-2.jpg)
![Re-Skin and Enclose for Full Building Restoration-1 Re-Skin and Enclose for Full Building Restoration](https://www.kconinc.com/wp-content/uploads/2023/07/Re-Skin-and-Enclose-for-Full-Building-Restoration-1.jpg)