Childcare Facility

This turn-key, fast track daycare facility project included:

  • Hybrid building method combining a 24-gauge structural steel building paired with conventional materials
  • Kitchen with cabinetry and countertops, island, appliances, storage, dining room
  • Separate boys and girls rooms, sleeping areas, living room, play room, bathrooms and laundry room
  • HVAC system, site utilities, electrical, A CCTV system and stringent fire/safety requirements
  • Concrete floor slab, termite treatment, sidewalks
  • Interior and exterior doors, exterior windows, wall and roof insulation, gutters and downspouts
  • Standard grade carpet, vinyl floor tile, latex paint system on all exposed walls, door frames, and trim
  •  4,000 SF