What We’re Up To (Video): Pre-Engineered Modular Office Facility Awarded via GSA

by | May 15, 2019 | Design Build, GSA Approved, K-Con News, Pre-Engineered Construction, Projects

K-Con, Inc. has been awarded the design-build Secure Temporary Office Modular Project (STOMP) pre-engineered building contract for the U.S. Navy at Naval Base Point Loma, California. K-Con teamed with sister company Panel Built, Inc. for this 22,000 square foot modular structure, which was contracted utilizing K-Con’s GSA Federal Supply contract. Designed to meet the customer’s needs and budget, K-Con will complete a safe installation of a stand-alone, secure level rated, 2-story, turn-key, new office facility.


STOMP First Floor plan

STOMP Second Floor plan

 

Fly-through video: